llama-design-drive

Whole Vision

Sometimes, tasks are not suitable for collaboration—coding falls under such a category.

In the Agile development process, we need to select a dedicated time slot to build the MVP together with full contribution, and then gradually update it in spare time based on feedback from the users.

With this approach, we divide our tasks into 3 stages: Design, Development, and Polish.


1. 🎨 Design

In this step, we summarize all design ideas, filter out the requirements for the MVP, and ensure that the MVP is complete and scalable.

Key Points:

Requirements:

  1. Keep terms in the design document at an abstract level—avoid specifying frameworks or tools directly.
  2. Provide useful information such as recommended packages or frameworks to choose from in the development phase.
  3. Use graphs where necessary to demonstrate the system design and provide detailed explanations for each node or element in the diagram.

2. ⚙️ Development

The engineering group will find a time slot (like Saturday and Sunday) and commit 20 hours per person. We will dive fully into the project through group or pair programming to complete the MVP and deploy it with the “Alpha” version tag.

Action Plan:


3. 🌟 Polish

The Alpha version will be tested within the group. Issues will be raised continuously, and engineers will work on resolving them to gradually polish the application.

Action Plan:


📋 Current Team


🗓 Plan for Each Stage

Design:

Development:

Polish: